Client Project: Armco Barrier installation for Norfolk Farm

Norfolk Farm Armco Barrier Project

Client Project: Armco Barrier installation for Norfolk Farm

Client Project: Material Supply and Delivery:

Client: Hook 2 Sisters

Hook 2 Sisters approached Armco Sales in late 2022 as they were in the process of formulating both a target cost and design for the Armco Barrier installation requirements at a number of their farms in the Norfolk, East Anglia area.

Since the initial communication between the parties in 2022, Armco Sales have provided Hook 2 Sisters with various Armco Barrier material supply estimates, including taking off quantities from drawings so target costs could be established. We also provided design advice so the client could establish a workable design solution for each of their projects.

Between July 2023 and January 2024, Armco Sales, using their own fleet of transport, have delivered approximately 550 linear metres of Armco Crash Barrier systems including 3.2m Beams, 760mm Bolt Down Posts, 1200mm Dig in Posts, Hi Vis End Caps + Fasteners and Fixings into various locations so the client could successfully carry out the desired installations.

armco barrier norfolk farm

During the early stages of the clients fit, Armco Sales personable teams also provided information on indicative post foundation sizes and post cross sections to facilitate the installation along with individual component weights so materials could be transported safely to
each site.

Please contact Armco Sales for any of your future Armco Barrier requirements you may have.